Bragging Rights

Our 2018-2019 Projects

At Penhall Company, we love any opportunity to showcase how truly talented and hardworking our Red and Gray Team is. With over 40 branches and projects of all magnitudes, the men and women of Penhall always rise to the challenge. Take a look at some of our project highlights from the past years.

 

The Colorado River Aqueduct Project:

The Colorado River Aqueduct is a massive 242 mile long water conveyance that provides Southern California with a large majority of its drinking water. Overtime, the structure’s concrete begins to crack and water begins to rust the underlying rebar. The continuous erosion means that every year the aqueduct needs to be shut down for two weeks to conduct maintenance and repairs.

A project of this magnitude takes many crews, around the clock work, and complete expertise. This year the team had over 117 locations to repair spanning over 97 miles! All hands were on deck, as Penhall teams from across the country flew out to come and get their hands dirty.

Penhall Company has proudly been apart of the Colorado River Aqueduct project now for over 15 years!

 

The Schuyler F. Heim Bridge Project:

The Schuyler F. Heim Bridge removal project used specially trained divers to perform underwater wire sawing, rigging, and removal of the bridge pier.

“Taking concrete solutions to new depths. When the State of California was facing an expensive and lengthy redesign of a vital roadway, they turned to Penhall for the solution.” -Senior Project Manager, Chad M.