CONCRETE CORING COMPANY
Penhall Company provided the selective structural demolition required to abandon the obsolete “Estancia High School Pool” as well as the demolition required to construct the new pool. Access to the existing pool as extremely limited; the pool was located within an atrium with very restrictive access through a small breezeway. Penhall Company utilized appropriately sized equipment to expeditiously complete all selective demolition required to abandon the existing pool shell.