PROJECT

Dell Children’s Hospital

Location: Austin, TX
Service: Wall Sawing, Core Drilling, Concrete Removal
Completion: September 2011

PROJECT HIGHLIGHTS

Surgical removal of four story cast in place concrete stairwell for hospital addition. Scope consisted of removal of architectural steel screening around stairwell prior to concrete removal. Temporarily shored concrete, wall sawed concrete risers and landings into sections not to exceed 10,000 lbs. Core drilled pick holes and removed with tower crane.

Scope consisted of removal of architectural steel screening around stairwell prior to concrete removal.

Hospital would not allow conventional excavator demolition methods due to the stairwell being attached to the hospital adjacent to patient rooms and limited access with the new construction. Diamond sawing, drilling and hoisting with the onsite tower crane was the optimal choice.

CONTACT US TODAY

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Site Contact Information

(XXX) XXX-XXXX
 

Site Location

Location*

After submitting this form a Penhall Company representative will be in contact with you to confirm your request. If this request is urgent, please call 1-800-PENHALL to be connected with the nearest Penhall branch. Upon submitting this form you will also receive occasional updates about our services and company announcements. You may unsubscribe from these e-mails at anytime.

OTHER ARTICLES

0322-2

How to Ensure a Safe Construction Site

scan w construction background

GPR Concrete Scanning Common Misconceptions

Penhall Rumble Strips

How Roadway Grinding & Grooving Provide a Safer Driving Experience