Penhall was contracted to saw and seal approximately 30,000 linear feet of joints across the taxiway and wash rack areas at McClellan Airfield. The project involved the following tasks:
- Saw Cutting: Precise cutting to create clean, uniform joints
- Joint Sealing: Sealing joints to protect against moisture infiltration and pavement deterioration
- High-Traffic Coordination: Careful planning to minimize disruption to ongoing airfield operations
- Aviation Standards Compliance: Adhering to strict aviation construction standards
- Efficiency & Quality: Expert execution to ensure a durable and long-lasting solution for the airfield’s infrastructure
Through methodical execution, Penhall successfully completed the project within the scheduled timeframe, ensuring the pavement’s longevity and structural integrity.