Penhall was hired to saw, remove and haul away a 650 ft x 25 ft area of 7” thick interior slab on grade. The slab removal enabled southern mechanical to install a sanitary line across the entire width of the 1m sf building.
Superintendent Tree Piercy and crew members, Chris Fears, Lenny Thomas, Nathan McCoy, Thomas Mahone and Larry Carlyle performed the work safely and efficiently, sawing and loading approximately 65 dump truck loads of slab on grade and exterior concrete pavement.