PROJECT HIGHLIGHTS

Together with Q&D we came up with a cut plan, pick plan and hazard analysis to complete this total bridge demo and build back with only a 7 day complete closure for Hwy 50. The job was  completed safely and Penhall’s scope was completed a full day earlier than allotted in the schedule. To complete this job we core drilled pick holes for the bridge deck to be removed in sections and crews flat sawed bridge deck into panels for removal. We wall sawed to separate bridge abutments and rock retaining walls

Together with Q&D we came up with a cut plan, pick plan and hazard analysis to complete this total bridge demo and build back with only a 7 day complete closure for Hwy 50.

CONTACT US TODAY

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Site Contact Information

(XXX) XXX-XXXX
 

Site Location

Location*

After submitting this form a Penhall Company representative will be in contact with you to confirm your request. If this request is urgent, please call 1-800-PENHALL to be connected with the nearest Penhall branch. Upon submitting this form you will also receive occasional updates about our services and company announcements. You may unsubscribe from these e-mails at anytime. Grinding and grooving services are conducted by Emery Sapp & Sons, Inc. For specific inquiries related to grinding and grooving, click here or reach out to Chris Fitzpatrick at chris.fitzpatrick@emerysapp.com

OTHER ARTICLES

8047BB4A-0E72-4BB5-8F6B-276BE2738391

What Is GPR? How Ground Penetrating Radar Works

03070F2E-D51A-4580-B39A-20FBE4B2B433

When to Use Concrete Cutting vs. Concrete Coring

20210502_104009

What Is Concrete Scarifying in Surface Preparation?