Reloj Del Sol Wind Turbine Foundation Demolition

Location: Austin, TX
Service: Demolition

PROJECT HIGHLIGHTS

Reloj Del Sol Wind Farm – Precision Foundation Removal

Penhall was contracted to demolish and remove a wind turbine foundation at the Reloj Del Sol Wind site in San Ygnacio, TX. The project involved breaking down 650 cubic yards of concrete using CAT 336 and CAT 325 excavators with hydraulic hammers.

Scope of Work:

  • Foundation Demolition – Efficient concrete breaking
  • Material Removal – Loading and hauling for proper disposal
  • Precision Execution – Protecting surrounding infrastructure
  • Site Preparation – Ensuring readiness for new foundation installation

With a focus on safety and efficiency, Penhall delivered a seamless demolition process, ensuring the site was cleared for the next phase of development.

Penhall efficiently demolished and removed a 650-cubic-yard wind turbine foundation, ensuring site readiness while protecting surrounding infrastructure.

CONTACT US TODAY

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Site Contact Information

(XXX) XXX-XXXX
 

Site Location

Location*

After submitting this form a Penhall Company representative will be in contact with you to confirm your request. If this request is urgent, please call 1-800-PENHALL to be connected with the nearest Penhall branch. Upon submitting this form you will also receive occasional updates about our services and company announcements. You may unsubscribe from these e-mails at anytime. Grinding and grooving services are conducted by Emery Sapp & Sons, Inc. For specific inquiries related to grinding and grooving, click here or reach out to Chris Fitzpatrick at chris.fitzpatrick@emerysapp.com

OTHER ARTICLES

scan low angle

Slab Scanning 101: When You Need It and What it Includes

8047BB4A-0E72-4BB5-8F6B-276BE2738391

What Is GPR? How Ground Penetrating Radar Works

03070F2E-D51A-4580-B39A-20FBE4B2B433

When to Use Concrete Cutting vs. Concrete Coring