PROJECT

Wall Sawing Services for HWY 147 Bridge Removal

Location: Raleigh, NC
Service: WALL SAWING, BRIDGE JOINTS
Completion: March 2020

PROJECT HIGHLIGHTS

Precision Wall Sawing at HWY 147 Bridge in Durham, NC
Penhall was contracted by Dragados USA to perform wall sawing services for the HWY 147 bridge joint replacement in Durham, NC. Using a Husqvarna 482 Wall Saw with angle brackets, our team precisely cut the bridge joint slide plate at a 45-degree angle, ensuring safe and efficient removal while maintaining the integrity of the surrounding structure.

Scope of Work:

  • Wall Sawing – Precision cutting of the bridge joint slide plate
  • Specialized Equipment – Husqvarna 482 Wall Saw for accurate 45-degree cuts
  • Structural Protection – Ensuring integrity during joint removal
  • Minimized Disruptions – Safe execution on an active bridge

Careful planning and coordination allowed Penhall to complete the project on schedule, ensuring a seamless joint replacement while keeping the bridge maintenance process moving forward.

Penhall delivered precision wall sawing for the HWY 147 bridge joint replacement, ensuring safe, efficient removal while maintaining structural integrity.

CONTACT US TODAY

"*" indicates required fields

Site Contact Information

(XXX) XXX-XXXX
 

Site Location

Location*

After submitting this form a Penhall Company representative will be in contact with you to confirm your request. If this request is urgent, please call 1-800-PENHALL to be connected with the nearest Penhall branch. Upon submitting this form you will also receive occasional updates about our services and company announcements. You may unsubscribe from these e-mails at anytime.

This field is for validation purposes and should be left unchanged.

OTHER ARTICLES

Penhall employees at site

What Do the Colors in Utility Marking Mean?

Penhall employees at site

The Difference Between Public and Private Utility Locating Services

Penhall employees at site

Post-Tension Cables: The Unsung Heroes of Modern Construction