PROJECT

Lawrence Lake Spillway

Location: Mt Hood, OR
Service: Wall Sawing
Completion: August 2020

PROJECT HIGHLIGHTS

Lawrence Lake is a manmade lake created in 1969. It covers about 160 acres and draws water from Clear Branch and Pinnacle Creek. Penhall Company was hired to wall saw roughly 30’x 12’ x 8” to 20” thick concrete sections of Lawrence Lake’s spillway.

This project posed several challenges, from the difficult access to working on the spillway safely. It proved difficult to move heavy equipment to the work location as the spillway is at an angle of about 30 degrees. We installed fall restraints for our crew as a safety measure when working. One major concern was that once we cut the spillway the entire structure could slide. The sections above our cut limits were anchored up to the dam above to prevent this from happening, and managed to complete all work efficiently and safely. 

Crews employed both a wall saw and hydraulic hand saw to finish the project.

This project posed several challenges, from the difficult access to working on the spillway safely.

CONTACT US TODAY

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Site Contact Information

(XXX) XXX-XXXX
 

Site Location

Location*

After submitting this form a Penhall Company representative will be in contact with you to confirm your request. If this request is urgent, please call 1-800-PENHALL to be connected with the nearest Penhall branch. Upon submitting this form you will also receive occasional updates about our services and company announcements. You may unsubscribe from these e-mails at anytime.

OTHER ARTICLES

0322-2

How to Ensure a Safe Construction Site

scan w construction background

GPR Concrete Scanning Common Misconceptions

Penhall Rumble Strips

How Roadway Grinding & Grooving Provide a Safer Driving Experience